Exhibition Stand Builder in South Korea

Custom exhibition stands for COEX Seoul, KINTEX and BEXCO – designed in Istanbul, built in our own workshop and delivered with the venue-appointed electrical partners Korean halls require.

Building an exhibition stand in South Korea: venues and rules

South Korea's main exhibition venues are KINTEX in Goyang, COEX in Seoul and BEXCO in Busan. Show manuals at COEX and KINTEX set a 5 m height limit, require flame-retardant materials, and require electrical work by a contractor registered with or appointed by the venue. VAV Grup designs and builds custom stands in Istanbul and works with the venue's appointed electrical partner on site.

Service area
South Korea
Proposal
Project-specific scope and quotation
Production
Own factory, Istanbul
Installation
Coordinated local installation
Main venues
COEX (Seoul), KINTEX (Goyang), BEXCO (Busan)

Local Exhibition Market Intelligence

Korea's three main venues are KINTEX in Goyang (108,011 m², the country's largest), BEXCO in Busan (46,380 m²) and COEX in Seoul (36,007 m²). Key B2B shows include SEMICON Korea and KIMES at COEX, SEOUL FOOD and SIMTOS at KINTEX, and KORMARINE and G-STAR at BEXCO. Typical show manuals cap stand height at 5 m and require electrics by a contractor registered with or appointed by the venue.

Key Exhibition Cities

  • Seoul
  • Goyang (KINTEX)
  • Busan

Major Trade Venues

  • COEX (Seoul)
  • KINTEX (Goyang)
  • BEXCO (Busan)

Exhibition Preparation Checklist

  • COEX and KINTEX show manuals typically limit stand height to 5 m (COEX: up to 6 m for large wall-side booths, 4 m in swing spaces).
  • All stand materials must be non-combustible or flame-retardant.
  • Electrics must be installed by a contractor registered with COEX or appointed by KINTEX; at KINTEX the construction contractor is registered online with the show secretariat.
  • Exhibits can travel on an ATA Carnet; confirm the re-export deadline with the issuer.

Exhibiting in South Korea: venues, fairs and stand rules

Short answer: South Korea's main exhibition venues are KINTEX in Goyang, COEX in Seoul and BEXCO in Busan. Show manuals at COEX and KINTEX set a 5 m height limit, require flame-retardant materials, and require electrical work by a contractor registered with or appointed by the venue. VAV Grup designs and builds custom stands in Istanbul and works with the venue's appointed electrical partner on site.

Main exhibition venues in South Korea

VenueCityOperatorIndoor space (official figure)
KINTEXGoyang (Seoul area)KINTEX108,011 m², 10 halls
BEXCOBusanBEXCO46,380 m² (AIPC profile)
COEXSeoul (Gangnam)Coex36,007 m², 4 halls

International B2B trade fairs in South Korea (next editions)

FairSectorVenueNext editionFrequency
G-STARGames (B2B days 19–20 Nov)BEXCO18–22 Nov 2026Annual
SEMICON KoreaSemiconductor equipment & materialsCOEX17–19 Feb 2027Annual
SEOUL FOODFood & hospitalityKINTEXJune (2026 edition 9–12 Jun)Annual
SIMTOSMachine toolsKINTEX2026 edition 13–17 Apr 2026—
KORMARINEShipbuilding & marine equipmentBEXCO19–22 Oct 2027Biennial

Dates as published by the organisers, checked 26 September 2026. Always confirm on the official show website before booking.

Venue rules that shape your stand design in South Korea

Custom stands fail approval most often on height, fire class of materials, rigging and electrics. These are the rules the venues publish:

COEX, Seoul (example: EV Trend Korea 2026 guide)

  • Maximum height 5 m; up to 6 m for large booths along the walls; 4 m in swing spaces.
  • All booth materials non-combustible or flame-retardant.
  • Electrical work by an electrical contractor registered with COEX; space-only setup through contractors designated by COEX.

Source: EV Trend Korea 2026 – booth construction guide (COEX)

KINTEX, Goyang (example: Korea Metal Week 2026 manual)

  • Maximum overall height of independent stands 5 m.
  • All construction and decoration materials flame retardant.
  • Electrics installed by a contractor chosen from KINTEX's appointed contractors; construction contractor registered online with the show secretariat.

Source: Korea Metal Week 2026 – exhibitor manual (KINTEX)

Rules can differ per show: the organiser's exhibitor manual for your fair always takes precedence. We read that manual before the first design sketch, not after.

Shipping a stand from Istanbul to South Korea

ATA Carnet in Korea: Korea accepts ATA Carnets for exhibitions and fairs, professional equipment and commercial samples; the Korea Chamber of Commerce and Industry is the guarantor. Sources differ on the maximum stay (6 months vs. up to 2 years), so we confirm the re-export date with the carnet issuer for each shipment. Consumable stand materials cannot travel on a carnet and are declared separately. (US Commercial Service – Korea temporary entry; TOBB – ATA Carnet FAQ)

Planning timeline for a custom stand in South Korea

  1. 20–16 weeks before: book space, send us the floor plan and stand number; we propose a design and budget.
  2. 16–12 weeks before: final design, structural details, material list with fire certificates; register the contractor with the organiser or venue as the show manual requires.
  3. Drawing deadline (set by the venue/organiser – see the rules above): submit stand drawings; order electricity, rigging and other venue-reserved services through the appointed contractors.
  4. 12–10 weeks before: production and pre-assembly in our Istanbul factory.
  5. 10–4 weeks before: sea or air freight with the customs documents (sea freight to East Asia typically takes several weeks, so the shipping date is fixed first).
  6. Build-up days: installation with the venue-appointed electrical partner, final check before opening.
  7. After the show: dismantling and return shipment or local disposal of consumables.

How VAV Grup delivers stands here

We are an independent stand contractor, not an official venue supplier. Your stand is designed and manufactured in Europe – in our factory on the European side of Istanbul – and shipped to South Korea; on site, installation is coordinated with the services the venue reserves for itself (mains electricity, rigging, sometimes floor plans). One project lead keeps the drawings, material certificates, transport and build-up schedule in one plan. Send the fair name, hall and stand number, stand size and deadline and we reply with a project-specific scope and quotation.

Facts on this page were checked against the official venue, organiser and government sources linked above on 26 September 2026. Figures are the venues' own; we do not claim past projects at every venue listed.

Our Key Services in South Korea

Custom Exhibition Stand Design

Tailor-made booth environments designed around your brand, products and visitor flow.

Exhibition Stand Construction

State-of-the-art timber, metal, and glass construction with turnkey handovers.

Country Pavilion Contractor

Turnkey national pavilions hosting exporters with unified premium branding.

Modular Exhibition Booths

Sustainable, reusable, and elegant aluminum and fabric frame solutions.

Why Work With VAV Grup in South Korea?

Turnkey Delivery

From 3D design and in-house manufacturing to logistics, venue approvals, and final dismantle. We handle everything.

Deadline-Controlled Planning

Milestones, transport windows and venue build-up slots are coordinated around the confirmed show schedule.

Venue Compliance

Required technical files, material certificates and venue submissions are coordinated according to the confirmed project scope.

Trusted by Global Brands Exhibiting in South Korea

Building custom stands at the world’s leading trade shows

HANNOVER MESSEMEDICAGITEX GLOBALARAB HEALTHAUTOMECHANIKATHE BIG 5GULFOODBAUMAMWC BARCELONAANUGA
HANNOVER MESSEMEDICAGITEX GLOBALARAB HEALTHAUTOMECHANIKATHE BIG 5GULFOODBAUMAMWC BARCELONAANUGA

VAV Grup by the Numbers

6,000 m²

Production facility, Ikitelli OSB, Istanbul

Hannover

Local base: storage, quality checks, on-site support

Sharjah

Contracted partner production facility (UAE)

Independent

Stand contractor working to organiser rules

Ready for a Quote?

Share your fair name, stand size, city/country and deadline. We will review your brief and respond with the fastest possible next step. Direct manufacturing, European project delivery, and coordinated local installation.

✓ Turnkey Production
✓ Fast Brief Review
✓ Deadline-focused
✓ Portfolio-backed

Frequently Asked Questions

Yes, but venue-reserved work goes through local partners: show manuals at COEX require electrical work by a contractor registered with COEX, and at KINTEX electrics are installed by one of KINTEX's appointed contractors and the construction contractor is registered online with the show secretariat.
The Korea Metal Week 2026 manual for KINTEX limits independent stands to 5 m overall height. Check your show's manual, as limits are set per event.
KINTEX in Goyang, with 108,011 m² across 10 halls according to KINTEX.
The stand is designed and manufactured directly by VAV Grup. International transport, venue documentation and local installation coordination are planned for the selected show and venue.
Send the show name, city, hall and stand number, floor plan, stand size, open sides, required functions, brand assets and deadline. VAV Grup then prepares a project-specific scope and quotation.
No. VAV Grup is an independent exhibition stand contractor hired directly by exhibitors and coordinates venue requirements for each confirmed project.

Start Your Stand ProjectProject Brief

Share the show, city and stand size so we can define the right project scope.

Project-led delivery
In-House Factory
Portfolio on request