EMO MILANO 2027 Exhibition Stand Builder
fieramilano • Milan, Italy
Who builds exhibition stands for EMO MILANO 2027?
Exhibition Stand Pro (VAV Grup İnovasyon İnşaat Mimarlık Ltd. Şti.) provides custom exhibition stand design and direct manufacturing and European project delivery for EMO MILANO 2027 at fieramilano in Milan, Italy (4 October 2027 - 8 October 2027). We are an independent contractor, not the official show contractor. Custom stand design and build in Istanbul, planned around the organiser's technical rules for the confirmed hall. Send the show name, stand size, hall and stand number to receive a project-specific scope and quotation.
- Show
- EMO MILANO 2027
- Venue
- fieramilano
- City
- Milan, Italy
- Dates
- 4 October 2027 - 8 October 2027
- Sector
- Technology & Electronics
- Proposal
- Project-specific scope and quotation
Venue
fieramilano
Date Range
4 October 2027 - 8 October 2027
Sector
Technology & Electronics
Who Exhibits Here?
According to the organiser, EMO MILANO is the world trade show dedicated to the metalworking sector, and the 2027 edition offers operators from all main user sectors a journey to the centre of innovation.
How to Design Your Booth for EMO MILANO 2027
See organiser
EMO MILANO 2027: exhibitor stand planning intelligence
As of 21 October 2026, EMO MILANO 2027 opens in 348 days on 4–8 October 2027.
Official dates
4–8 October 2027
Opening hours
Daily 09:30–18:00 without interruption (organiser's 2027 General Rules, art. I/3)
Venue
fieramilano exhibition centre, Rho (Milan), Italy
Organiser
EFIM-Ente Fiere Italiane Macchine SpA (organiser named in the 2027 General Rules); promoted by CECIMO, the European Association of Manufacturing Technologies; the organisation of the event is entrusted to the operational structures of UCIMU-Sistemi per Produrre
Latest official figures
EMO MILANO 2021 (previous Milan edition; organiser press release of 23 September 2025): the organisers succeeded in attracting 60,000 operators (the Italian original reads oltre 60.000, more than 60,000). For 2027 the organisers have reserved all 12 exhibition halls available for the trade show
Build-up / breakdown dates
Set-up 23 September–3 October 2027, to be completed by 12:00 on 3 October; dismantling may start only after the show closes (9 October) and must be finished no later than 12 October 2027 (organiser's 2027 General Rules, art. IV/19 and IV/22)
Stand height limits
Maximum stand height 6.50 m from the pavilion floor, where the technical and structural characteristics of the individual pavilion allow it; two-storey stands need the organiser's prior consent and Fiera Milano's approval of the design, are allowed only on a single continuous stand area of at least 90 m2 and may not exceed 6.50 m, the second level may not exceed 50% of the stand area or 200 m2 in total, and the request must reach the organiser no later than 60 days before set-up begins (organiser's 2027 General Rules, art. IV/19)
Stand planning priorities
- ◆Confirm hall and stand position with the organiser before design work starts
- ◆Request the organiser's technical guidelines for build-up, breakdown and stand height
- ◆Plan graphics, freight and installation around the organiser's schedule
- ◆Check organiser rules on approvals and services for custom stands
Send this for a buildable proposal
- ✓Stand size and open sides
- ✓Products and demo requirements
- ✓Meeting and storage space needs
- ✓Branding and graphics deadlines
Official sources
VAV Grup Turnkey Solutions for this Exhibition
Custom stand design and build in Istanbul, planned around the organiser's technical rules for the confirmed hall.
Trusted by Global Brands
Building custom stands at the world’s leading trade shows
VAV Grup by the Numbers
6,000 m²
Production facility, Ikitelli OSB, Istanbul
Hannover
Local base: storage, quality checks, on-site support
Sharjah
Contracted partner production facility (UAE)
Independent
Stand contractor working to organiser rules
Frequently Asked Questions
Start Your Stand ProjectProject Brief
Share the show, city and stand size so we can define the right project scope.